If a pipeline is built, according to Wood MacKenzie, “Fairbanks could change to gas for energy/heat needs. We assume 90 percent penetration with a 3-year transition. (2031-2033.)”
Does that mean 90 percent of buildings within the city? Or 90 percent of buildings in the borough? What is the cost of building the infrastructure to serve 90 percent of either?
Read More